2
CN EN
Products and Solutions
Cable handling industry applications
Cable handling industry applications

The ER50 robot is used, and the 1.5-meter cable handling fixture is installed on the end flange. The attitude of the robot changes greatly. The high-speed attitude change is adopted to smoothly remove the cable, and then the EFORT advanced automatic palletizing process is used to realize automatic and accurate stacking. 


Service hotline

400-052-8877

Business consultation

Official account

Return to the top