CN EN
Products and Solutions
Cable handling industry applications
Cable handling industry applications

The ER50 robot is used, and the 1.5-meter cable handling fixture is installed on the end flange. The attitude of the robot changes greatly. The high-speed attitude change is adopted to smoothly remove the cable, and then the EFORT advanced automatic palletizing process is used to realize automatic and accurate stacking. 


Business consultation

Business consultation

1406832902

Telephone consultation

400-052-8877

Return to the top